The Flood Alleviation Scheme Work 2007
Current works
Click here for the continuing Flood Alleviation Scheme Work in 2008
27st October '07
The Sluice at Brookend
During the week the excavations at the site of the Sluice at Brookend have started. The new tunnel has been started and some of the pipe liners have been delivered. | |
Homs Road area
| In the Homs Road area, excavations of the new channel for the brook are continuing. Also the new shaft is still being dug out and is now being constantly pumped out. |
The Bund
Further excavations at the bund have been carried out to build up the bank for the bund. This is a temporary bund that is being built to allow the work
downstream to continue throughout the winter. After this, the final bund will be built in this area. Everyday GPS position measuring equipment is used to check that the alignment of the banks exactly match the plan.
1 The brook referred to as the Chatterley Brook is actually a unnamed brook that flows from Weston-under-Penyard past Chackley Grove.
It has only recently become referred to as the Chatterley Brook and locally it was previously known as Chackley Brook.